UEESS00198

Hybrid Photovoltaic, Wind and Battery Storage Systems Installer Skill Set

Description

This Skill Set is for persons who are required to install hybrid photovoltaic, wind and battery storage systems.

Skill set requirements

A total of 6 units of competency must be attained.

There are units of competency within this Skill Set that contain pre-requisites. Units of competency that have a pre-requisite requirement are identified by this symbol *. Refer directly to the units of competency to identify pre-requisite requirements to ensure all are complied with. A list of all pre-requisites is also provided in the UEE Pre-requisite Companion Volume.

RIIWHS204E

Work safely at heights

UEERE0049

Apply safe work practices in the rooftop solar industry

UEERE0076

Install and maintain wind energy systems to power conversion equipment *

UEERE0078

Install battery storage to power conversion equipment *

UEERE0079

Install off-grid power conversion equipment to electrical installation *

UEERE0081

Install photovoltaic systems to power conversion equipment *

For full details please visit: https://www.training.gov.au/training/details/UEESS00198/qualdetails