CPCCON3049
Apply and finish sprayed concrete
Application
This unit of competency specifies the skills and knowledge required to apply and finish pre-mixed concrete using wet and dry spraying methods. Sprayed concrete has application where conventional concreting methods cannot be used such as for barrel vaulting, caissons, canal linings, diaphragm walls, drainage channels, irrigation systems, piled wall facings, reservoirs, shell roofs and domes, silo structures, tunnel linings, walls and water towers. The unit does not cover the application of sprayed concrete to shape and finish swimming pool and spa shells.
A person who has achieved this unit of competency would be expected to take responsibility for organising and completing work tasks with a high degree of self-direction.
Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some states and territories. For further information, check with the relevant regulatory authority.
Completion of the general construction induction training program, specified in the Safe Work Australia model Code of Practice: Construction Work, is required by anyone carrying out construction work. Achievement of CPCWHS1001 Prepare to work safely in the construction industry meets this requirement.